Back to home
Transport·

Andorra Road Tunnels Face Closures for Maintenance May 19-28

Andorra's Mobility Department schedules tunnel maintenance from May 19 to 28, featuring daytime lane closures and full overnight shutdowns. Drivers must use detours like Rocafort Avenue and follow signage.

Key Points

  • Ràdio Andorra tunnel: single lane closure May 19, 10am-noon.
  • Pedrera and Sant Antoni: one lane closed May 19, 3-6pm; Tàpia full closure 9pm-2am.
  • Pont Pla full overnight closures May 21-22, 9pm-4am.
  • Dos Valires south tube May 25, north May 26 (9pm-6am); Tàpia again May 27-28.

Andorra's Mobility Department has scheduled maintenance work on several road tunnels from May 19 to 28, with disruptions including partial lane closures and full overnight shutdowns.

The work begins on May 19, starting with a single lane closure in the Ràdio Andorra tunnel from 10am to noon. Later that day, one lane will close in the Pedrera and Sant Antoni tunnels from 3pm to 6pm, followed by a full closure of the Tàpia tunnel from 9pm to 2am.

On May 21 and 22, the Pont Pla tunnel will face full overnight closures from 9pm to 4am. The Dos Valires tunnels follow on May 25 and 26: the south tube closes fully from 9pm to 6am on the 25th, and the north tube on the 26th with the same hours. The Tàpia tunnel will close again on May 27 and 28 from 9pm to 6am.

Motorists should use designated alternatives. For Tàpia closures, traffic will divert to Rocafort Avenue. Pont Pla disruptions can be bypassed via the Dos Valires tunnels or Fiter i Rossell Avenue. Dos Valires closures offer Fiter i Rossell Avenue or the Pont Pla tunnel as options.

The department urges drivers to plan trips ahead, follow on-site signage, and heed instructions from traffic agents.

Share the article via